this post was submitted on 28 Dec 2023
507 points (97.6% liked)

World News

39004 readers
2789 users here now

A community for discussing events around the World

Rules:

Similarly, if you see posts along these lines, do not engage. Report them, block them, and live a happier life than they do. We see too many slapfights that boil down to "Mom! He's bugging me!" and "I'm not touching you!" Going forward, slapfights will result in removed comments and temp bans to cool off.

We ask that the users report any comment or post that violate the rules, to use critical thinking when reading, posting or commenting. Users that post off-topic spam, advocate violence, have multiple comments or posts removed, weaponize reports or violate the code of conduct will be banned.

All posts and comments will be reviewed on a case-by-case basis. This means that some content that violates the rules may be allowed, while other content that does not violate the rules may be removed. The moderators retain the right to remove any content and ban users.


Lemmy World Partners

News [email protected]

Politics [email protected]

World Politics [email protected]


Recommendations

For Firefox users, there is media bias / propaganda / fact check plugin.

https://addons.mozilla.org/en-US/firefox/addon/media-bias-fact-check/

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 100 points 10 months ago (6 children)

That's the engineering knowledge lost over the last 30 years costed out.

Making 2 reactors since 95 has some side effects, a lot of the senior engineers since then have retired, standards have changed, and new engineers need to learn.

[–] [email protected] 35 points 10 months ago (4 children)

Exactly what I was thinking

It like those highspeed rail projects that are finally getting going in the US, they're over budget because a lot of people now have to be trained on how to work on such a project due to either lost knowledge or new stuff they're learning during the process

[–] [email protected] 23 points 10 months ago (1 children)

Another factor in the trains, at least for California, is that the project was put on hold for a while because of the hyper loop crap. Now they need to resume buying land for the track and prices are where they are

[–] [email protected] 4 points 10 months ago (2 children)

Honestly they should just specify the project as a public works project, would give them eminent domain rights and skip the whole 9 yards of land pricing. It would force it to be done based off fair market price instead of the inflated BS all land is currently at. Least if I understand eminent domain right.

[–] [email protected] 5 points 10 months ago (1 children)

I don't know for certain but I expect they used eminent domain.

[–] [email protected] 2 points 10 months ago* (last edited 10 months ago) (1 children)

I think you're right. I'm from Canada, so laws might be different, but AFAIK, eminent domain means the owner can't say, "No, I'm not selling" to the government, not that the government has total control over the price. Landowners can also argue that losing that portion of land will negatively affect the remaining property and argue in court to be compensated.

[–] [email protected] 2 points 10 months ago* (last edited 10 months ago) (1 children)

And since California has Prop 13, i wonder if landowners can sue for the future tax increases for the replacement property? Afterall, that is a direct consequence of the forced sale of the land.

"You are increasing my property taxes forever. So you should be responsible for that increase... forever."

[–] [email protected] 1 points 10 months ago (1 children)

Good Point!

Site Note: A family member who lives in California recently explained how their property taxes are calculated, and that system is crazy! That system encourages people to never move, which probably contributes to housing issues because seniors are dis-incentivized from down-sizing, etc.

[–] [email protected] 1 points 10 months ago

Yep.

We used to have the problem of senior citizens having their property taxes jacked up every year to the point that the taxes are almost as high as the original purchase price. Bunch of seniors were ending up losing their houses.

Prop 13 was designed to fix that; and it did, but it also caused a bunch of 'unintended consequences'.

[–] [email protected] 3 points 10 months ago

Eminent domain is subjected to legal challenges. Both to the authority (there must be a purpose) and also to the FMV assessment. Which costs money. And time.

If it was as easy as snapping their fingers, it would've happened.

[–] [email protected] 14 points 10 months ago (1 children)

Nah they are over budget because there is no incentive to keep under budget, it was sub contracted out so much that there is either no communication/miscommunication/or willfully not listening, sales pretended they were engineers, and bad engineers were promoted to project management.

I work in infrastructure.

Me three weeks ago on email to main contractor: hello, your spec is calling for some parts that are no longer manufactured which means we will have to buy used. Leading to more money now and higher replacement part costs in the future for the government. Plus these parts are on the border of safe.

This morning: your exception list was rejected, follow spec.

So a small city in California is getting a brand new system made of used parts. No this isn't a direct quote this is a summary.

[–] [email protected] 1 points 10 months ago (1 children)

can the maintenance department who will be eventually responsible start working on fabricating those so you'll have new-made even if not off the shelf? rapid prototyping and small runs....

[–] [email protected] 3 points 10 months ago

Nah. I deal with the electronics and city maintenance departments arent going to sit there and clone a touch screen from the late 90s. Even if they somehow could it wouldn't matter because the spec calls for products by brand name.

This is why there are cost overruns. It's crap like this.

[–] [email protected] 5 points 10 months ago

The paying to train is one thing. The bigger problem is people who aren't super experienced in these projects doing estimates and costings.

You're always going to have some overruns, and if you're lucky, some underruns too. But if your estimates are out of wack... well. Good luck. Combine that with Parkinson's law and you are in for a world of hurt.

[–] [email protected] 5 points 10 months ago

It's a big job to train all those train trainers.

[–] [email protected] 17 points 10 months ago

Yep. The failed dual reactor project in SC that also used the AP1000s was a gigantic clusterfuck. Most of the major contractors had essentially no experience on projects of the scale and it resulted in massive cost overruns, delays, and a compounding web of fraud and lies to shareholders and regulators that wound up in utility executives in prison and the eventual sale of the entire utility SCANA to Dominion Energy.

[–] [email protected] 12 points 10 months ago

Cost overruns in the nuclear industry are nothing new. It's been the norm. The AP1000 design used here was supposed to solve some of those issues, but it's been more of the same.

[–] [email protected] 9 points 10 months ago

Welders and other tradesmen too. I met a guy from the NRC that said that there were few if any welders certified and knowledgeable enough to work on reactor construction. And this was 15 yrs ago.

[–] [email protected] 2 points 10 months ago

Haha, this is insightful, but I worry an incorrect conclusion re: cost and overruns. Yes, lots of extremely experienced engineers have retired; but, the pace even in the 70s, 80s and 90s was oft beset by slowdowns and overruns. See: 9 mile, river bend, rancho seco, comanche peak, and those are just the ones I know off the top of my head.

We need more, but it's a nuclear-and-renewables, not nuclear instead of renewables. I hope smr and other designs get a better shake this time, because climate change doesn't bode well for coastal installations, and frankly, building many more large PWRs isn't going to happen quickly.

Frankly I hope we can turn the experience debt to our advantage - rigorous investigation of all the many options disregarding the established dogma of large PWRs would be good in my view. YMMV.

[–] [email protected] 0 points 10 months ago

This is more than a cost issue. It's a knowledge issue. Countries can't lost this type of knowledge otherwise they lost independence as well.