this post was submitted on 12 Dec 2023
17 points (90.5% liked)

United Kingdom

4068 readers
542 users here now

General community for news/discussion in the UK.

Less serious posts should go in [email protected] or [email protected]
More serious politics should go in [email protected].

Try not to spam the same link to multiple feddit.uk communities.
Pick the most appropriate, and put it there.

Posts should be related to UK-centric news, and should be either a link to a reputable source, or a text post on this community.

Opinion pieces are also allowed, provided they are not misleading/misrepresented/drivel, and have proper sources.

If you think "reputable news source" needs some definition, by all means start a meta thread.

Posts should be manually submitted, not by bot. Link titles should not be editorialised.

Disappointing comments will generally be left to fester in ratio, outright horrible comments will be removed.
Message the mods if you feel something really should be removed, or if a user seems to have a pattern of awful comments.

founded 1 year ago
MODERATORS
 

One of Britain’s biggest power grid projects has awarded contracts worth £1.8bn for a 190km subsea electricity superhighway to bring renewable power from Scotland to the north of England.

National Grid and Scottish Power plan to begin building the “transformative” £2.5bn high-voltage power line along the east coast of the country from East Lothian to County Durham from 2025.

The Eastern Green Link 1 (EGL1) project is one of Britain’s largest grid upgrade projects in generations and has been designed to carry enough clean electricity to power the equivalent of 2 million households.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 3 points 10 months ago* (last edited 10 months ago) (1 children)

Not sure its have to. Vs being cheaper. Lets face it land above sea level has more value to humans then that below.

Placing cables on the sea floor by ship is there fore likely cheaper then building pilons or digging wires via wanted land.

Not to mention the the owner of the under sea land around the UK, is one person. As opposed to negotiating with multiple parties.

[–] [email protected] 1 points 10 months ago

From what I've read previously, it's not cheaper in terms of the material cost, but yes, the property rights. Why it's such an issue at the border, I'm not sure.