this post was submitted on 09 Mar 2024
70 points (100.0% liked)

Ask Lemmy

26756 readers
1331 users here now

A Fediverse community for open-ended, thought provoking questions

Please don't post about US Politics. If you need to do this, try [email protected]


Rules: (interactive)


1) Be nice and; have funDoxxing, trolling, sealioning, racism, and toxicity are not welcomed in AskLemmy. Remember what your mother said: if you can't say something nice, don't say anything at all. In addition, the site-wide Lemmy.world terms of service also apply here. Please familiarize yourself with them


2) All posts must end with a '?'This is sort of like Jeopardy. Please phrase all post titles in the form of a proper question ending with ?


3) No spamPlease do not flood the community with nonsense. Actual suspected spammers will be banned on site. No astroturfing.


4) NSFW is okay, within reasonJust remember to tag posts with either a content warning or a [NSFW] tag. Overtly sexual posts are not allowed, please direct them to either [email protected] or [email protected]. NSFW comments should be restricted to posts tagged [NSFW].


5) This is not a support community.
It is not a place for 'how do I?', type questions. If you have any questions regarding the site itself or would like to report a community, please direct them to Lemmy.world Support or email [email protected]. For other questions check our partnered communities list, or use the search function.


Reminder: The terms of service apply here too.

Partnered Communities:

Tech Support

No Stupid Questions

You Should Know

Reddit

Jokes

Ask Ouija


Logo design credit goes to: tubbadu


founded 1 year ago
MODERATORS
 

My team has this one shared component that gets involved in like every feature's development. This year, we're loading like 5 different features onto it, all with different timelines, and my head's about to explode trying to figure out how to make it all fly.

How does everyone else do their software releases? Do you freeze prod and then do one big release later? Throw everything into prod during dev, hope no one sees the unreleased stuff, and just announce it later? Or something else entirely?

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 1 points 8 months ago* (last edited 8 months ago)

If you have multiple branches you're mixing into one:

  1. Have a code repo. Shockingly a consulting firm I worked at didn't have a repo system.

  2. QA each branch.
    Merge all the code.
    Deploy to a testing server and QA that. Fix as needed
    Deploy to staging for final testing. Test and verify deployment procedure. Fix as needed
    Deploy to prod.