this post was submitted on 21 Oct 2023
50 points (94.6% liked)

Mechanical Engineering

206 readers
1 users here now

Welcome to the Mechanical Engineering Community!

Rules:

1.) Be constructive and respectful.

2.) No advertising/self-promotion.

3.) No low-effort posts.

4.) No "design this for me" posts.

5.) Images must be relevant to Mechanical Engineering or the posted topic.

6.) We're not doing your homework for you.

founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[โ€“] [email protected] 6 points 1 year ago* (last edited 1 year ago) (1 children)

Looks like all the easy definitions have been taken care of by others.

More GD&T always drives the floor jockeys piping hot mad, so do that to excess. Position at MMC, angularity, flatness of the nail head, give them the beans.

However, Having also worked with enough plant floor people-

If you don't have a separate view showing the fully installed configuration you are wasting your time with all those notes. Nobody gonna read them.