24
submitted 1 year ago by [email protected] to c/[email protected]
you are viewing a single comment's thread
view the rest of the comments
[-] [email protected] 6 points 1 year ago* (last edited 1 year ago)

Turrella station in Sydney has maintained full function during the (still ongoing) elevator installation and stairs rebuild. They've installed temporary stairs on one end. The contractors can be as slow as they want, all it does is make people have to walk an extra 50m.

It's had some shutdowns, but for other work (wires & tracks & signals) and typically short.

this post was submitted on 11 Sep 2023
24 points (92.9% liked)

Brisbane

954 readers
8 users here now

Home of the bin chicken. Visit our friends:

founded 1 year ago
MODERATORS