143
submitted 1 year ago by [email protected] to c/[email protected]

Uranium is $128.30/kg

After enrichment, conversion and fabrication that's $3400/kg for 4.95% fuel.

At 36-45MWd/kg and a net thermal efficiency of 25% or $12.5/MWh up front.

With a 90 month lead time (72 month fuel cycle and 18 months inventory) at 3% this is $16.2/MWh

Which some solar projects are now matching

you are viewing a single comment's thread
view the rest of the comments
[-] [email protected] 1 points 1 year ago

Also you're lying about the second part https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=178

You see, the rule of thumb is very easy. If a nukebro or industry PR tells you something, there's a 96% chance it's a lie until someone else checked and they backpedalled at least 5 times. This is in spite of being forced to report the truth through other channels much of the time.

this post was submitted on 26 Aug 2023
143 points (95.0% liked)

Green Energy

2126 readers
47 users here now

everything about energy production

founded 2 years ago
MODERATORS