this post was submitted on 11 Sep 2023
15 points (74.2% liked)

Monero Mining

248 readers
1 users here now

founded 1 year ago
MODERATORS
 

Previous post: https://monero.town/post/279294

Finished building and setting up my 4 3900 builds, read my previous post for more details. Figuring out the best way to build them into the shelf was a lot of trial and error, especially with cable management. Took a few hours, but I'm glad it worked out in the end. I was satisfied with my undervolt on the first rig, but unfortunately I was not able to transfer it to the second. I ended up just using dcop and keeping all the cpus stock for uniformity instead of individually overclocking all the machines. Right now they're doing 12.2-12.4kh/s at 80-84c which is making the room quite toasty, should be nice in the winter (not so much in the summer). Would ROI in about 3 years at the current rate. The top machine is a 5600x which I use as a home server, running monerod and p2pool. I used to run nixos but I eventually switched back to alpine like the other 5 machines. Currently using docker-compose and nixery.

Sorry the text is so dense, feel free to ask questions.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 2 points 1 year ago

Super cool setup! It's giving me a lot of ideas for one I might build later. Thanks for sharing this!