126
this post was submitted on 30 Sep 2024
126 points (97.7% liked)
[Dormant] Electric Vehicles
3195 readers
1 users here now
We have moved to:
A community for the sharing of links, news, and discussion related to Electric Vehicles.
Rules
- No bigotry - including racism, sexism, ableism, casteism, speciesism, homophobia, transphobia, or xenophobia.
- Be respectful, especially when disagreeing. Everyone should feel welcome here.
- No self-promotion.
- No irrelevant content. All posts must be relevant and related to plug-in electric vehicles — BEVs or PHEVs.
- No trolling.
- Policy, not politics. Submissions and comments about effective policymaking are allowed and encouraged in the community, however conversations and submissions about parties, politicians, and those devolving into general tribalism will be removed.
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
What are you talking about? 200A is a HUGE panel as it is. You're going to have a hard time getting bigger than that on a residential connection. If you go balls to the wall with the big stuff in your house, you'd be looking at about 30 amps for AC, 50 for stove and oven (by the way, that's all burners and oven running at the same time. Happy Thanksgiving?), 30 for a clothes dryer, and you still have 90 amps at 240 volts remaining.
Oh, and realistically that's two 90-amp sets of 120 volts. And really, most people charge their car at night, when demand and rates are lower. Maybe your AC is going to run occasionally, but you're probably not making that Thanksgiving feast while laundry is going
You forgot the furnace and water heater. If those are electric, it can easily max out a 200 amp panel.
Also, the fact that you'll never use the full 50 amps on the range isn't really important. There are calculations on how much you can overbook your panel. Once you hit that limit, electricians and code won't allow it.
Admittedly I use gas for both those things, so yes, I did forget about them. The point largely remains: it's highly unlikely that you'll have all loads going at full blast, and for that reason the load calculation is far more complex than simply adding up the breakers. It also understands that circuits are generally only partially used, and that the worst case scenario is a nuisance, not a hazard.