85
submitted 1 day ago by [email protected] to c/[email protected]

Firebrick systems powered by renewable energy could be used for up to 90% of industrial process heat applications, the Stanford study says. Meeting that demand in the U.S. would require firebrick system capacity of 2.6 TWh, with a peak discharge rate of 170 GW.

you are viewing a single comment's thread
view the rest of the comments
[-] [email protected] 1 points 22 hours ago

They use hot air warmed by gas burners.

Since we're using electricity here, and this was mentioned in the study linked elsewhere, they used ceramic heaters.

this post was submitted on 20 Sep 2024
85 points (97.8% liked)

Technology

58164 readers
3844 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS