this post was submitted on 27 Jul 2024
234 points (98.0% liked)

Memes

45657 readers
1590 users here now

Rules:

  1. Be civil and nice.
  2. Try not to excessively repost, as a rule of thumb, wait at least 2 months to do it if you have to.

founded 5 years ago
MODERATORS
 

for anyone who wants to offer actual advice: its a lenovo thinkpad t450 with a soldered i5-5300U that hits over 90C when running cargo compiles. I have changed the thermal paste and it didn't do much.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 40 points 3 months ago (2 children)

Just leaving this here in case you don't know: there are also the Framework laptops, which are designed to be modular, upgradable, and have easy to buy replacement parts.

They even sell motherboards, so you can now get a e.g. Intel Core Ultra motherboard for your 3-4 year old laptop.

Of course It's a bit more expensive than a used 10 year old Thinkpad, but it kind of competes with other high end laptops, and it is cheaper especially when you consider it's designed to last more

(Not a sponsored post, just glad there is a company that makes such products, and that when I broke a part I could just go to their store and order a replacement instead of searching for serial numbers on random online stores etc like I've done before)

[–] [email protected] 7 points 3 months ago (1 children)

They don't ship to where I live ¯_(ツ)_/¯

[–] [email protected] 5 points 3 months ago (2 children)
[–] [email protected] 11 points 3 months ago

As someone who desperately wants a fair phone but it doesn't ship here, consider what it means to buy a repairable device when replacement parts are not easily obtained.

[–] [email protected] 2 points 3 months ago (2 children)
[–] [email protected] 2 points 3 months ago* (last edited 3 months ago) (1 children)

No idea. Shipito.com is what I used

[–] [email protected] 1 points 3 months ago* (last edited 2 months ago)

I used Aramex's shop&ship (both times), I found them from Courier Center's website.

The cost was a bit much, but nothing compared to the laptop itself (and also I really didn't want to buy yet another laptop that in a few years would be obsolete and unrepairable).

The laptop's order shipping was €70 and it took ~10 days after it arrived at their location. You can compare the shipping cost to/from various countries, my DIY package was 4.5kg

Edit: just a few days after making this comment, I received an email from Framework that they started shipping to Greece, among other countries!