When I first read the titile, I thought that the US is going to have to build A LOT to triple global production. Then it occured to me that the author means the US is pledging to make deals and agreements which enable other countries to build their own. Sometimes I think the US thinks too much of itself and that's also very much part of American branding.

Where are my renewable bros at? Tell me this is bad.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 79 points 1 year ago (29 children)

I’m a renewable bro. I wanna see as much money pumped into as much infrastructure for renewables as possible. I wanna see solar on every building. I wanna see off-shore wind and tidal energy production. I’m keenly following development of clean, efficient, and cost-effective energy storage technologies, and much is being done in this space to support a future switch to full renewable reliance.

That won’t change the fact that we need on-demand energy now and we need to stop using coal and gas as soon as possible. We currently don’t have energy storage at scale. We will, but we don’t. So in the meantime, nuclear is probably the best option to pursue for use over the next couple of decades while we continue to invest in, and implement, renewables.

[–] [email protected] 21 points 1 year ago* (last edited 1 year ago) (19 children)

I will have to strongly disagree here. The timelines are actually the main reason why I would disqualify Nuclear power as a solution to energy, even as a temporary one.

The time from inception to going online for a new Nuclear reactor is in the range of 15-25 years. Of course we could attempt to shorten that, but that would probably mean compromising on safety. So indeed, if we want to stop using fossil fuels asap, building solar, wind, and hydro, which come online in a matter of months (maybe years for hydro), is much faster.

Aggravating this are two further issues: Current Nuclear energy production is non-renewable, and supply problems are already known to occur at current energy production levels. Second, the global construction capacity is limited, probably to around current levels. Even if we do not push for faster construction times, the number of companies and indeed people who have the necessary expertise are already at full capacity, and again, expanding that would probably imply safety problems.

That is to say, currently running Nuclear power plants are save and clean, so by all means keep doing it until renewables take over. But expanding Nuclear power to solve the energy problem is a non-starter for me, due to the timeline and it being non-renewable. And that is before we start talking about the very real dangers of Nuclear power, which are not operational of course, but due to proliferation, war, and governmental or general societal instability (due to say, climate change).

[–] [email protected] 9 points 1 year ago

The time from inception to going online for a new Nuclear reactor is in the range of 15-25 years.

In the US. In China, nuclear reactors go from first pour to operation in 5-6 years. Economies of scale apply.