this post was submitted on 16 Oct 2023
1051 points (98.6% liked)

Memes

45525 readers
1346 users here now

Rules:

  1. Be civil and nice.
  2. Try not to excessively repost, as a rule of thumb, wait at least 2 months to do it if you have to.

founded 5 years ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 23 points 1 year ago (9 children)

I never understood why they did not switch to solar power when the fossil fuel got so sparse.

[–] [email protected] 2 points 1 year ago (2 children)
[–] [email protected] 7 points 1 year ago

Reads like an advice: think long-term, start the transition as early as possible. So, basic rationality.

[–] [email protected] 1 points 1 year ago

It would be interesting to see them update that with current data since global PV installations are estimated at 392 GW for 2023.

It is unrealistic to imagine that we could jump into a full-scale infrastructure replacement in one year. To set the scale, the U.S. uses about 3 TW of continuous power. A 1% drop corresponds to 30 GW of power. Our modest 2% replacement therefore would require the construction of about 60 new 1 GW power plants in a single year, or a rate of one per week! Worldwide, we quadruple this number.

What capability have we demonstrated in the past? In 2010, global production of solar photovoltaics was 15 GW, which is only about 6% of what we would need to fill a world-wide energy gap of 2% per year. Even on a tear of 50% increase per year, it would take 7 years to get to the required rate. Wind installations in 2010 totaled 37 GW, or 14% of the 2% global requirement. It would take 5 years at a breakneck 50% per year rate of increase to get there. When France decided to go big on nuclear, they built 56 reactors in 15 years. In doing so, they replaced 80% of their electricity consumption, which translates to about 30% of their total energy use. So this puts them at about 2% per year in energy replacement.

load more comments (6 replies)