this post was submitted on 01 Aug 2023
1586 points (98.1% liked)

Technology

59583 readers
3235 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

(page 2) 50 comments
sorted by: hot top controversial new old
[–] [email protected] 14 points 1 year ago (2 children)

Wait... is this the USA's first Gen III+ reactor?

load more comments (2 replies)
[–] [email protected] 13 points 1 year ago

Good to see industrial self sufficiency coming back to the US

[–] [email protected] 13 points 1 year ago (43 children)

The nameplate cost of this plant is $32 per watt. Even at smaller scales, utility-scale solar plants are $1 per watt. Do you know how many grid storage batteries you could buy with the extra $31 per watt? (6 hour storage is around $2.50 per watt or $.40/Wh.) You could build a solar plant 4x the nameplate capacity of the nuke (in order to match the capacity factor), and add 24 hours of storage to make it fully dispatchable, and still have enough money left over to build 2 more of the same thing. This doesn't even include the fact the nuclear has fuel costs, waste disposal, higher continued operational costs, and unaccounted publicly involuntarily subsidized disaster insurance.

load more comments (43 replies)
[–] [email protected] 13 points 1 year ago (3 children)

Ah, i remember studying the Westinghouse AP1000 reactor design when I was at Uni. It had just been approved, and numerous plants were expected, with the first expected to be online from around 2010.

It’s 2023, and this is the first one to go live in the US.

load more comments (3 replies)
[–] [email protected] 11 points 1 year ago (1 children)

Vogtle was a massive shitshow of corruption and delays, never thought it would actually be finished. Ironically, the price of electricity is set to go up, so that promise of lower bills has gone out the window.

load more comments (1 replies)
[–] [email protected] 10 points 1 year ago (4 children)

This is awesome to see, but I wonder if an array of Small Modular Reactors would be the way to do it in the future. Nuclear is a fantastic and safe source of clean energy, so I hope it can compete better on the economic side.

load more comments (4 replies)
[–] [email protected] 9 points 1 year ago

Outstanding!

[–] [email protected] 9 points 1 year ago

Yay! Nuclear is the best!

[–] [email protected] 8 points 1 year ago (2 children)

Goated energy source, hope the stigma lessens over time

load more comments (2 replies)
[–] [email protected] 8 points 1 year ago (1 children)

With today's contractors? Good luck with that.

[–] [email protected] 10 points 1 year ago (2 children)

At this time of year? Localized entirely in your kitchen?

load more comments (2 replies)
[–] [email protected] 8 points 1 year ago (10 children)

Everything is a stopgap until fusion is available

[–] [email protected] 11 points 1 year ago

We can't let that hinder progress toward implementing the most responsible forms of power generation.

load more comments (9 replies)
[–] [email protected] 7 points 1 year ago

About fucking time.

load more comments
view more: ‹ prev next ›